{"id":11638,"date":"2023-12-05T14:15:49","date_gmt":"2023-12-05T14:15:49","guid":{"rendered":"https:\/\/tedae.org\/?p=11638"},"modified":"2024-04-02T10:48:18","modified_gmt":"2024-04-02T10:48:18","slug":"navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz","status":"publish","type":"post","link":"https:\/\/tedae.org\/en\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/","title":{"rendered":"Navantia entrega en Jeddah a la Real Marina de Arabia Saud\u00ed la cuarta corbeta construida en Bah\u00eda de C\u00e1diz"},"content":{"rendered":"<p>El ministro de Defensa de Arabia Saud\u00ed, Pr\u00edncipe Khalid bin Salman, entreg\u00f3 este lunes a la Real Marina de Arabia Saud\u00ed (RSNF) la cuarta de las cinco corbetas construidas en los astilleros de Bah\u00eda de C\u00e1diz de Navantia. De acuerdo con lo establecido en el contrato, la entrega se celebr\u00f3 en la base naval Rey Faisal, en Jeddah.<\/p>\n\n\n\n<p>La corbeta, de nombre JAZAN (C549), fue transportada a Jeddah en un barco especializado y all\u00ed se someti\u00f3 a los \u00faltimos trabajos de construcci\u00f3n e integraci\u00f3n de los sistemas, confirmando la capacidad de transferencia de tecnolog\u00eda (ToT) y localizaci\u00f3n de la producci\u00f3n por parte de Navantia a la joint venture SAMINavantia.<\/p>\n\n\n\n<p>A la ceremonia asistieron el Jefe de Estado Mayor, General Fayyad bin Hamed al Ruwaili; el Comandante de la Real Marina de Arabia Saud\u00ed, Almirante Fahad Bin Abdullah Al-Ghofaily; la secretaria de Estado de Comercio, Xiana M\u00e9ndez; el Almirante Jefe de Personal de la Armada, Gonzalo Sanz y el presidente de Navantia, Ricardo Dom\u00ednguez.<\/p>\n\n\n\n<p>Asistieron asimismo el viceministro de Defensa, Dr. Albiyari; el vice gobernador de GAMI, Mohammed Alathel; y el subsecretario de Adquisiciones, Ibrahim Alsuwayed; el CEO de SAMI, Walid Abukhaled; el presidente de SAMINavantia, Mohammed Alkahtani y la CEO de SAMINavantia, Sof\u00eda Honrubia.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>El programa Avante 2200<\/strong><\/h4>\n\n\n\n<p>La corbeta JAZAN es la cuarta de las cinco que componen el programa Avante 2200. Tiene una eslora de 104 metros, una manga de 14 y ser\u00e1 capaz de transportar a un total de 102 personas entre tripulaci\u00f3n y pasaje.<\/p>\n\n\n\n<p>El dise\u00f1o de las corbetas es de \u00faltima generaci\u00f3n, maximizando a la vez la participaci\u00f3n de Navantia mediante la incorporaci\u00f3n de productos propios, como el sistema de combate CATIZ, el sistema de comunicaciones integradas HERMESYS, la direcci\u00f3n de tiro DORNA, el Sistema Integrado de Control de Plataforma y el puente integrado MINERVA, junto con otros equipos desarrollados por Navantia bajo licencia, como los motores de MTU, las cajas reductoras de RENK.<\/p>\n\n\n\n<p>Este contrato, en vigor desde noviembre de 2019, ha servido para fortalecer el futuro inmediato de Navantia y ha beneficiado a todos los astilleros de la compa\u00f1\u00eda y a su industria auxiliar, en especial, a toda la Bah\u00eda de C\u00e1diz.<\/p>\n\n\n\n<p>Ha supuesto una carga de trabajo global de alrededor de siete millones de horas que, traducido a empleo, han alcanzado la cifra de 6.000 anualmente durante los cinco a\u00f1os de duraci\u00f3n del programa. De estos, m\u00e1s de 1.100 han sido empleados directos, m\u00e1s de 1.800 empleados de la Industria Auxiliar de Navantia y m\u00e1s de 3.000 empleados indirectos generados por otros suministradores. Han sido m\u00e1s de 100 las empresas auxiliares que colaboren en el mismo.<\/p>\n\n\n\n<p>El programa, cuyo \u00faltimo buque deber\u00e1 ser entregado en el a\u00f1o 2024, incluye, adem\u00e1s de la construcci\u00f3n, el Apoyo al Ciclo de Vida durante cinco a\u00f1os, desde la entrega del primer buque, con opci\u00f3n a otros cinco a\u00f1os adicionales.<\/p>\n\n\n\n<p>Por otro lado, el contrato tambi\u00e9n incluye el suministro de varios servicios, tales como apoyo log\u00edstico integrado, adiestramiento operacional y de mantenimiento, suministro de Centros de Formaci\u00f3n y Adiestramiento para el Sistema de Combate y Sistema de Control de Plataforma de los buques, el Apoyo al Ciclo de Vida y los sistemas para el mantenimiento de los buques en la Base Naval de Jeddah.<\/p>","protected":false},"excerpt":{"rendered":"<p>El ministro de Defensa de Arabia Saud\u00ed, Pr\u00edncipe Khalid bin Salman, entreg\u00f3 este lunes a la Real Marina de Arabia Saud\u00ed (RSNF) la cuarta de las cinco corbetas construidas en los astilleros de Bah\u00eda de C\u00e1diz de Navantia. De acuerdo con lo establecido en el contrato, la entrega se celebr\u00f3 en la base naval Rey<\/p>","protected":false},"author":5,"featured_media":11639,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[434],"tags":[96],"class_list":{"0":"post-11638","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-aeronautica","8":"tag-navantia"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Navantia entrega en Jeddah a la Real Marina de Arabia Saud\u00ed la cuarta corbeta construida en Bah\u00eda de C\u00e1diz - TEDAE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tedae.org\/en\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Navantia entrega en Jeddah a la Real Marina de Arabia Saud\u00ed la cuarta corbeta construida en Bah\u00eda de C\u00e1diz - TEDAE\" \/>\n<meta property=\"og:description\" content=\"El ministro de Defensa de Arabia Saud\u00ed, Pr\u00edncipe Khalid bin Salman, entreg\u00f3 este lunes a la Real Marina de Arabia Saud\u00ed (RSNF) la cuarta de las cinco corbetas construidas en los astilleros de Bah\u00eda de C\u00e1diz de Navantia. De acuerdo con lo establecido en el contrato, la entrega se celebr\u00f3 en la base naval Rey\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tedae.org\/en\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/\" \/>\n<meta property=\"og:site_name\" content=\"TEDAE\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-05T14:15:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-02T10:48:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tedae.org\/wp-content\/uploads\/2024\/01\/navantia-cobertas-arabia-saudita.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"TEDAE\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@espaciotedae\" \/>\n<meta name=\"twitter:site\" content=\"@espaciotedae\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"TEDAE\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/\"},\"author\":{\"name\":\"TEDAE\",\"@id\":\"https:\\\/\\\/tedae.org\\\/en\\\/#\\\/schema\\\/person\\\/113a30a9c13bf4827297415a25bd1cc4\"},\"headline\":\"Navantia entrega en Jeddah a la Real Marina de Arabia Saud\u00ed la cuarta corbeta construida en Bah\u00eda de C\u00e1diz\",\"datePublished\":\"2023-12-05T14:15:49+00:00\",\"dateModified\":\"2024-04-02T10:48:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/\"},\"wordCount\":581,\"publisher\":{\"@id\":\"https:\\\/\\\/tedae.org\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tedae.org\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/navantia-cobertas-arabia-saudita.webp\",\"keywords\":[\"NAVANTIA\"],\"articleSection\":[\"Aeron\u00e1utica\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/\",\"url\":\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/\",\"name\":\"Navantia entrega en Jeddah a la Real Marina de Arabia Saud\u00ed la cuarta corbeta construida en Bah\u00eda de C\u00e1diz - TEDAE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tedae.org\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tedae.org\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/navantia-cobertas-arabia-saudita.webp\",\"datePublished\":\"2023-12-05T14:15:49+00:00\",\"dateModified\":\"2024-04-02T10:48:18+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/#primaryimage\",\"url\":\"https:\\\/\\\/tedae.org\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/navantia-cobertas-arabia-saudita.webp\",\"contentUrl\":\"https:\\\/\\\/tedae.org\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/navantia-cobertas-arabia-saudita.webp\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tedae.org\\\/aeronautica\\\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/tedae.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Navantia entrega en Jeddah a la Real Marina de Arabia Saud\u00ed la cuarta corbeta construida en Bah\u00eda de C\u00e1diz\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tedae.org\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/tedae.org\\\/en\\\/\",\"name\":\"TEDAE\",\"description\":\"Defensa, Seguridad, Aeron\u00e1utica y Espacio\",\"publisher\":{\"@id\":\"https:\\\/\\\/tedae.org\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tedae.org\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/tedae.org\\\/en\\\/#organization\",\"name\":\"TEDAE, Defensa, Seguridad, Aeron\u00e1utica y Espacio\",\"url\":\"https:\\\/\\\/tedae.org\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/tedae.org\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/tedae.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/logo-svg-color.svg\",\"contentUrl\":\"https:\\\/\\\/tedae.org\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/logo-svg-color.svg\",\"width\":300,\"height\":85,\"caption\":\"TEDAE, Defensa, Seguridad, Aeron\u00e1utica y Espacio\"},\"image\":{\"@id\":\"https:\\\/\\\/tedae.org\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/espaciotedae\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/tedae\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCvtCvdowrYJGJGdnUKRKeSg\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tedae.org\\\/en\\\/#\\\/schema\\\/person\\\/113a30a9c13bf4827297415a25bd1cc4\",\"name\":\"TEDAE\",\"url\":\"https:\\\/\\\/tedae.org\\\/en\\\/author\\\/tedae\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Navantia entrega en Jeddah a la Real Marina de Arabia Saud\u00ed la cuarta corbeta construida en Bah\u00eda de C\u00e1diz - TEDAE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tedae.org\/en\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/","og_locale":"en_GB","og_type":"article","og_title":"Navantia entrega en Jeddah a la Real Marina de Arabia Saud\u00ed la cuarta corbeta construida en Bah\u00eda de C\u00e1diz - TEDAE","og_description":"El ministro de Defensa de Arabia Saud\u00ed, Pr\u00edncipe Khalid bin Salman, entreg\u00f3 este lunes a la Real Marina de Arabia Saud\u00ed (RSNF) la cuarta de las cinco corbetas construidas en los astilleros de Bah\u00eda de C\u00e1diz de Navantia. De acuerdo con lo establecido en el contrato, la entrega se celebr\u00f3 en la base naval Rey","og_url":"https:\/\/tedae.org\/en\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/","og_site_name":"TEDAE","article_published_time":"2023-12-05T14:15:49+00:00","article_modified_time":"2024-04-02T10:48:18+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/tedae.org\/wp-content\/uploads\/2024\/01\/navantia-cobertas-arabia-saudita.webp","type":"image\/webp"}],"author":"TEDAE","twitter_card":"summary_large_image","twitter_creator":"@espaciotedae","twitter_site":"@espaciotedae","twitter_misc":{"Written by":"TEDAE","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/#article","isPartOf":{"@id":"https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/"},"author":{"name":"TEDAE","@id":"https:\/\/tedae.org\/en\/#\/schema\/person\/113a30a9c13bf4827297415a25bd1cc4"},"headline":"Navantia entrega en Jeddah a la Real Marina de Arabia Saud\u00ed la cuarta corbeta construida en Bah\u00eda de C\u00e1diz","datePublished":"2023-12-05T14:15:49+00:00","dateModified":"2024-04-02T10:48:18+00:00","mainEntityOfPage":{"@id":"https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/"},"wordCount":581,"publisher":{"@id":"https:\/\/tedae.org\/en\/#organization"},"image":{"@id":"https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/#primaryimage"},"thumbnailUrl":"https:\/\/tedae.org\/wp-content\/uploads\/2024\/01\/navantia-cobertas-arabia-saudita.webp","keywords":["NAVANTIA"],"articleSection":["Aeron\u00e1utica"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/","url":"https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/","name":"Navantia entrega en Jeddah a la Real Marina de Arabia Saud\u00ed la cuarta corbeta construida en Bah\u00eda de C\u00e1diz - TEDAE","isPartOf":{"@id":"https:\/\/tedae.org\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/#primaryimage"},"image":{"@id":"https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/#primaryimage"},"thumbnailUrl":"https:\/\/tedae.org\/wp-content\/uploads\/2024\/01\/navantia-cobertas-arabia-saudita.webp","datePublished":"2023-12-05T14:15:49+00:00","dateModified":"2024-04-02T10:48:18+00:00","breadcrumb":{"@id":"https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/#primaryimage","url":"https:\/\/tedae.org\/wp-content\/uploads\/2024\/01\/navantia-cobertas-arabia-saudita.webp","contentUrl":"https:\/\/tedae.org\/wp-content\/uploads\/2024\/01\/navantia-cobertas-arabia-saudita.webp","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/tedae.org\/aeronautica\/navantia-entrega-en-jeddah-a-la-real-marina-de-arabia-saudi-la-cuarta-corbeta-construida-en-bahia-de-cadiz\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/tedae.org\/"},{"@type":"ListItem","position":2,"name":"Navantia entrega en Jeddah a la Real Marina de Arabia Saud\u00ed la cuarta corbeta construida en Bah\u00eda de C\u00e1diz"}]},{"@type":"WebSite","@id":"https:\/\/tedae.org\/en\/#website","url":"https:\/\/tedae.org\/en\/","name":"TEDAE","description":"Defensa, Seguridad, Aeron\u00e1utica y Espacio","publisher":{"@id":"https:\/\/tedae.org\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tedae.org\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/tedae.org\/en\/#organization","name":"TEDAE, Defensa, Seguridad, Aeron\u00e1utica y Espacio","url":"https:\/\/tedae.org\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/tedae.org\/en\/#\/schema\/logo\/image\/","url":"https:\/\/tedae.org\/wp-content\/uploads\/2024\/04\/logo-svg-color.svg","contentUrl":"https:\/\/tedae.org\/wp-content\/uploads\/2024\/04\/logo-svg-color.svg","width":300,"height":85,"caption":"TEDAE, Defensa, Seguridad, Aeron\u00e1utica y Espacio"},"image":{"@id":"https:\/\/tedae.org\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/espaciotedae","https:\/\/www.linkedin.com\/company\/tedae","https:\/\/www.youtube.com\/channel\/UCvtCvdowrYJGJGdnUKRKeSg"]},{"@type":"Person","@id":"https:\/\/tedae.org\/en\/#\/schema\/person\/113a30a9c13bf4827297415a25bd1cc4","name":"TEDAE","url":"https:\/\/tedae.org\/en\/author\/tedae\/"}]}},"jetpack_featured_media_url":"https:\/\/tedae.org\/wp-content\/uploads\/2024\/01\/navantia-cobertas-arabia-saudita.webp","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/tedae.org\/en\/wp-json\/wp\/v2\/posts\/11638","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tedae.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tedae.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tedae.org\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/tedae.org\/en\/wp-json\/wp\/v2\/comments?post=11638"}],"version-history":[{"count":1,"href":"https:\/\/tedae.org\/en\/wp-json\/wp\/v2\/posts\/11638\/revisions"}],"predecessor-version":[{"id":11640,"href":"https:\/\/tedae.org\/en\/wp-json\/wp\/v2\/posts\/11638\/revisions\/11640"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tedae.org\/en\/wp-json\/wp\/v2\/media\/11639"}],"wp:attachment":[{"href":"https:\/\/tedae.org\/en\/wp-json\/wp\/v2\/media?parent=11638"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tedae.org\/en\/wp-json\/wp\/v2\/categories?post=11638"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tedae.org\/en\/wp-json\/wp\/v2\/tags?post=11638"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}